Home    Ambient    Cerulean    Mix    MyGarmin

Friday, July 27, 2018

Crush Load

A medical emergency at Olympic Village required Translink to shut down one of the Canada Line tracks. The disembodied voice at the Broadway terminal warned that trains are at "crush load". That term actually exists: "In the context of transport economics and planning, crush load refers to the maximum level of passenger load for a particular vehicle or rail carriage. Crush loads are calculated for the number of passengers per unit area, standing up." (wikipedia.org). And so it was.