Friday, July 27, 2018
Crush Load
A medical emergency at Olympic Village required Translink to shut down one of the Canada Line tracks. The disembodied voice at the Broadway terminal warned that trains are at "crush load". That term actually exists: "In the context of transport economics and planning, crush load refers to the maximum level of passenger load for a particular vehicle or rail carriage. Crush loads are calculated for the number of passengers per unit area, standing up." (wikipedia.org). And so it was.
Thursday, July 26, 2018
Wednesday, July 25, 2018
Monday, July 23, 2018
Tuesday, July 17, 2018
2018 Race Schedule
Orcas 50K: Feb 3 >> 7:59 @76% (ouch!)
Run Ridge Run 25K: Feb 24 >> 3:06 @45%
Dirty Duo 50K: Mar 10 >> 7:32 @58%
Mac 50K: May 12 >> 6:49 @44%
Survival Of The Fittest 35K: May 26 >> 5:15 @47%
Survival Of The Fittest 35K: May 26 >> 5:15 @47%
MEC Ambleside Park 50K: Jun 3 >> 6:40:37 @48%
Tenderfoot Boogie 50M: Jun 23 >> 12:17 @67%
Beaverhead 100K: Jul 14 >> DNF
Mt Rainier Circumnavigation: Aug 3 >> Cancelled
Monday, July 16, 2018
Beaverhead 100K ~ my first DNF
Such an excellent adventure, and lots of fun with Cary and Lori. I made it as far as Gold Stone Pass at mile 46 but missed the cutoff there. Big congrats to Cary for getting the job done. And big thanks to Lori for being such a great Sherpa.
Tuesday, July 10, 2018
Monday, July 9, 2018
Thursday, July 5, 2018
Wednesday, July 4, 2018
Subscribe to:
Posts (Atom)